- Location: Soto del Barco, Asturias, Spain
- Technical Solutions: Launching Gantries & Traditional Formwork
- Total length: 435 m
- Maximum pier height: 72 m
The project faced complex ground conditions and was carried out on two simultaneous fronts. Beyond marking the beginning of the company’s activity, the infrastructure significantly improved regional mobility, becoming part of a key route for local and inter-regional connections.