
This project takes place in Antuérpia, the largest city of the Flanders region and has the company Jan De Nul Group (Official) as General Contractor. The works that are part of the package awarded to ConstruGomes are the replacement of the existing quay walls at the channel B2 dock in the port of the Scheldt river.
The main objective of these works is the extension of the existing canal. Also within the scope of ConstruGomes is the construction of new walls along an extension of about 800 meters in length. The remodelling of the dock is an impressive project, with over 15 thousand cubic meters of concrete and almost 7 thousand square meters of formwork.