- Year of execution: 2005
- Location: Ballota, Spain
- Technical Solutions: Self-launching Gantries & Climbing Formwork
- Total length: 424 m
- Number of spans: 9
Projects on the A8 are characterised by their multidisciplinary nature, integrating different areas of civil engineering, namely the construction of two tunnels, three overpasses and a viaduct, the Cadavedo Viaduct. Forming a structurally significant complex of high technical and functional complexity.





