Post with history 30/50

Category
Publication
14 August, 2026
The construction of the Elejalde Viaduct in Bilbao represented a significant engineering challenge, resulting in an infrastructure designed to overcome the complexity of the terrain and ensure the continuity of the road network.
  • Year of execution: 2008
  • Location: Bilbao, Spain
  • Technical Solutions: Climbing Formwork
  • Maximum pier height: 37 m

ConstruGomes participated in the construction of the piers supporting the viaduct deck. As highly demanding structural elements, the piers required precision, rigorous control and an execution process capable of ensuring strength, stability and durability. This involvement forms part of ConstruGomes’ track record and demonstrates its expertise in the construction of large-scale, complex concrete structures.