Communications

Post with history 13/50

Category
Publication
16 April, 2026
Following the projects developed along the A8, a new structure emerges where integration into the territory and structural efficiency once again play a decisive role.
  • Year of execution: 2005
  • Location: Ballota, Spain
  • Technical Solutions: Climbing Formwork & Self-launching Gantries
  • Total length: 135 m*2

The Ribo Viaduct is part of this structural framework, continuing the interventions carried out in Ballota. Located in an area of high topographical complexity, it stands out for its ability to adapt to the terrain, ensuring the continuity of the road alignment through the construction of a twin viaduct.