- Year of execution: 2006
- Location: Oviedo, Spain
- Technical Solutions: Ground Shoring System
- Total length: 180m
Throughout the project, ConstruGomes participated in the execution of structures designed to ensure road continuity, safety, and functional integration along one of the main connections in northern Spain. Even today, these works remain a reflection of the company’s technical capability and experience in developing solutions applied to infrastructure engineering.







