Communications

Post with history 18/50

Category
Publication
22 May, 2026
Integrated into the AS-17 road corridor, between Oviedo and Gijón, in Asturias, these four overpasses represented another challenge associated with the development of regional road infrastructure.
  • Year of execution: 2006
  • Location: Oviedo, Spain
  • Technical Solutions: Ground Shoring System
  • Total length: 180m

Throughout the project, ConstruGomes participated in the execution of structures designed to ensure road continuity, safety, and functional integration along one of the main connections in northern Spain. Even today, these works remain a reflection of the company’s technical capability and experience in developing solutions applied to infrastructure engineering.