- Year of execution: 2008
- Location: Basagoiti, Spain
- Technical Solutions: Shoring system
- Total extension: 427,00 m * 2
The double viaduct, connecting two tunnels, contributed to improving regional mobility and transport infrastructure. The project stood out for its innovative use of V-shaped inclined pillars, which reduced the number of supports required, minimized visual and environmental impact, and enhanced construction efficiency. Through this project, ConstruGomes strengthened its ability to deliver technically demanding, sustainable, and innovative engineering solutions.






