Year of execution: 2008
Location: Bilbao, Spain
Technical Solutions: Form Travellers, Traditional Formwork e Climbing Formwork
Total extension: 955.00 m
ConstruGomes played a important role in the construction of this infrastructure, being responsible for the execution of the piers, reaching a maximum height of 37 metres, and for the construction of the bridge deck using three pairs of form travellers. This engineering structure accommodates heavy daily traffic from both freight and passenger vehicles, ensuring safer and more efficient circulation.