- Year of execution: 2008
- Location: Guipúscoa, Spain
- Technical Solutions: Form Traveler
- Total extension: 218,00 m
The viaduct was constructed using the balanced cantilever form traveler method, this method enables the structure to be built progressively from the piers, significantly reducing the need for ground-based falsework and minimizing interference with the valley below.