- Year of execution: 2008
- Location: Zamora, Spain
- Technical Solutions: Shoring System
- Total extension: 275,00 m x2
Its construction required a highly complex technical operation, reflected in the execution of the reinforced concrete piers, the assembly of the formwork and reinforcement, and the extensive shoring system used to support the deck throughout the different stages of construction. Cranes, temporary structures and specialised teams worked in coordination until the various elements became one continuous infrastructure.