- Year of execution: 2009
- Location: Cofrentes, Spain
- Technical Solutions: Self-Launching Formwork and Climbing Formwork
- Full length: 520,00 m
For the construction of the bridge deck, ConstruGomes used an overhead self-launching formwork system, whose main innovation lies in the OPS (Optimized Power System). This system simulates the functioning of a human muscle, automatically adjusting the applied force according to the load being supported. This technology reduces deformations and minimizes structural stresses, enabling greater control and efficiency during construction.








