Between the mountains and valleys of the Basque Country, the Mondragón–Eskoriatza High-Speed Railway emerged as one of the region’s major engineering challenges, shaped by particularly demanding terrain. The need to overcome significant changes in elevation and cross the landscape with precision turned each viaduct into an undertaking where engineering, planning and technical expertise had to progress side by side.
  • Year of execution: 2009
  • Location: Aramaio, Spain
  • Technical Solutions: Movable Scaffolding system
  • Full length: 1420.00 m

Along this route, the succession of tunnels and imposing viaducts made every stage of construction an exercise in precision, planning and technical expertise. It was in this context that solutions such as Launching Gantries played an important role in the construction of the bridge decks, supporting the progress of a project designed to cross particularly challenging terrain.