The A3 Biebelried motorway project - the Fürth/Erlangen interchange motorway - consists of a stretch of more than 70 km that will be completely restored due to the high level of wear and tear on its infrastructure and paving.
This section includes one of the most emblematic and largest projects, the TB Aurachtalbrücke, on which ConstruGomes is working.
This project, which involves many challenges, such as the particular "PI" shaped piers with a transverse beam and a demanding deadline for the execution of the bridge, will use a movable scaffolding system for the execution of its deck.
Special formwork for "PI" shaped piers
M45-I movable scaffolding system
Total length | 330.71 m * 2
Max. bridge span | 45.00 m
Max. pier height | 14.60 m
Width | 19.41 m
No. of spans | 14 (7*2)