This method consists of supporting the MSS on the final elements (piers and abutments), being also possible to use part of the already built bridge deck as a support. After the correct positioning of the formwork, transported by the MSS, the steel reinforcement is positioned in its interior. The concrete pouring on each span can be done in more than one phase. The MSS launching is done span by span, by hydraulic mechanisms, being completely autonomous. The range of partnerships that ConstruGomes is part of, allows it to be in the forefront regarding the adoption of new technologies, being the OPS system (Organic Prestressing System) the pinnacle.

Technology benefits

  • Reduces the planning of the deck execution substantially;
  • Fast concreting cycles per span: 1 to 3 weeks;
  • Optimization of cost / income when compared to other technical solutions;
  • Equipment versatility - easily re-adaptable to new projects;
  • Increased safety.

Services

  • By using our own resources and partnerships, we provide technical services and skilled manpower to assemble, launch and disassemble movable scaffolding systems;
  • Monitoring of pre and post assembling services, in order to achieve, through cooperation with our clients, the best quality/price solution;
  • Partnerships with equipment suppliers for presentation of turnkey solutions.