As part of the A7 motorway, which is nine hundred and forty-five kilometres long, the A7 Thalaubachtalbrucke project involves the upgrading and replacement of several bridges. One of these is the Thalaubachtalbrucke Bridge, which will be replaced by a new one.
The new deck, with a total length of three hundred and eighteen meters, will be built using the incremental launch method, as determined by Autobahn GmbH. ConstruGomes will carry out all the work on the deck and infrastructure of this work of art.
Use of an incremental launching system with a nose of 33.25 meters
Segments and launchings of 25 meters
Deck inserted at a radius of 1.875 meters
Total length | 318.00 m
Max. bridge span | 50.00 m
Max. pier height | 35.00 m
Width | 12.80 m
No. of spans | 13