The reconstruction of the A9 motorway between Badhoevedorp and Holendrecht includes the construction of various temporary and permanent structures, serving different functions and dimensions, over a stretch of more than 12 km.
As part of this project, the "Deepcut Amstelveen" tunnel stands out, consisting of both open and closed sections. ConstruGomes is responsible for executing the northern section of the tunnel, covering mainly the following works: formwork installation, placement of large-diameter drainage pipes, application of waterproofing membranes, and concreting.
PERI "MAXIMO" formwork
PERI "VARIO" formwork
Total length | 1,600.00 m
Average segment width | 25.00 m
Average segment length | 28.00 m
No. of segments | 56