To divert traffic during the execution of the Oosterweel Project, a temporary motorway, known as Bypass Noord, will be constructed.
The construction of this bypass will take place in two phases: the North and East sections. The North section, the longest, extends between the Jozef Masure Bridge and the Sports Palace. The East section connects the Sports Palace to the Antwerp-Oost junction.
The scope of works assigned to ConstruGomes includes the near-complete execution of the foundations, pillars, and deck. The company will be responsible for the assembly and dismantling of formwork, installation and removal of work platforms and their respective access structures, reinforcement placement, installation of support devices and prefabricated beams, as well as the execution of joints and concreting.
Permanent formwork of the "Recoform" type for foundations
DOKA Framax formwork for the construction of pillar
Traditional DOKA formwork for transverse bracings between prefabricated beams
DOKA "Paratop" brackets for work platforms
Total length | 1200.00 m
Maximum span between supports | 45.00 m
Average height | 9.70 m
Width | 15,00 m
No. of spans | 39