ConstruGomes was awarded the execution of 4 viaducts that are part of the project that includes the construction of the EN14 bypass between Maia and Trofa.
The benefits achieved with the implementation of this project are the following: improvement of traffic flow / reduction of congestion; strengthening road safety; strengthening of economic and social cohesion in the national territory.
The works under the responsibility of ConstruGomes are: supply and placement of formwork, placement of rebars that are cut and molded by the client, prestressing sheaths and concreting.
Foundations - Orma formwork
Piers - Enkoform V-100 formwork with C2000 brackets
Deck - BERD Movable Scaffolding System M44-S
Viaduct 7.1
Full length | 264.00 m
Piers max. height | 28.50 m
Viaduct 8.1
Full length| 180.00 m
Piers max. height | 30.00 m
Viaduct 8.2
Full length | 744.00 m
Piers max. height | 47.50 m
Viaduct 9.1
Full length| 472.00 m
Piers max. height | 23.60 m