This project is part of the A5 Highway, it’s one of the several highways that are being rehabilitated in the German road network.
These works consist of constructing the abutments and one pier alignment, to posteriorly install the precast beams that will withstand the deck’s compression place. The existence of the German railway high-speed lane made the safety aspect throughout these works a real challenge.
Use of special formwork to execute triangular column geometry
Abutment length | 12.00 m
Abutment max. height | 8.54 m
Piers max. height | 7.95 m