A wing traveller works in a similar way to the MSS and the form traveller machines, acting as a movable concrete mould to complete the full deck width. Concrete is poured into both sides of the machine at the same time, enabling workers to cast sections of the outer deck on each side of the viaduct with or without struts. Once the concrete has set, hydraulic jacks push the machine forward to the next position and the cycle is repeated. Both the overhead and the underslung WT are designed for the same purpose. The underslung wing traveller system can be adapted to different types of bridges, such as cable stayed structures, leaving no obstructions to temporary or permanent cables as well as giving the opportunity for an easy «back – launch» to its initial installation position. For projects where reinforcement is to be prefabricated, the underslung wing traveller is the perfect choice. The external formwork for this WT is supported from below, leaving no obstruction to place prefabricated bottom slab, web and top slab reinforcement.

Technology benefits

  • Its modular components help it adapt flexibly to different geometries;
  • Short periods of time to assemble / disassemble;
  • Pouring cycles per segment: 4-5 days;
  • Highly specialized teams for the assembly and operation of any type of equipment;
  • Optimization of costs and income when compared to other equipment.

Services

  • Consulting and development of solutions;
  • Possibility of rental / sale of equipment;
  • Bridge deck execution with any type of equipment available on the market;
  • Turnkey solutions;
  • Specialized teams for assembling and operating any type of equipment;
  • Coordination and monitoring of the works;
  • Technical support.