The shoring system is a temporary solution which aims to support the weight of the structure while the concrete is placed and compacted. Once the concrete structure acquires the necessary strength for self-support, the dismantling of the temporary falsework can be proceeded. ConstruGomes has used heavy propped formwork up to 40m of bridge span and height. These systems are normally limited to a height of 40m because of material limitations and safety considerations.

Technology benefits

  • Equipment versatility - easily re-adaptable to new projects;
  • Cost optimization when applied to low height decks.

Services

  • Design and Concept of propping technical solutions developed by the R&D department;
  • Study of specific solutions for different lengths of spans and deck’s heights;
  • Teams highly specialized in the assembly of existing formwork solutions on the market.